Posted: Sep 14, 2021 3:24 am
You mean the 4” concrete topping on the metal deck in NCSTAR 1-6 that is the basis for the modelling?
This was pointed out by me previously.
https://tsapps.nist.gov/publication/get ... _id=101279
Sent from my iPad using Tapatalk
This was pointed out by me previously.
https://tsapps.nist.gov/publication/get ... _id=101279
Sent from my iPad using Tapatalk